Tar D Tank Project – AM/NS Hazira, Surat
Tar D Tank Project at AM/NS Hazira, Surat – Tank Erection, Structural Dismantling, Welding and Grinding Works
Project Overview
KARMASTHALA INFRA & SERVICES PRIVATE LIMITED has been awarded a work order by Gillanders Arbuthnot & Co. Ltd. (MICCO Division), Kothari Group, for the Tar D Tank Project at the Coke Oven By-Product (COBP) area of AM/NS Hazira, Surat, Gujarat.
The project involves tank erection, dismantling of structural materials, and welding and grinding of tank joints to meet the specified non-destructive testing (NDT) requirements. The work is to be carried out in accordance with the applicable AM/NS technical specifications, approved drawings, site requirements, and safety standards.
Through this project, Karmasthala Infra & Services continues to strengthen its capabilities in industrial contracting, tank erection, structural dismantling, welding, grinding, and associated material-handling activities.
Client and Project Details
- Company: KARMASTHALA INFRA & SERVICES PRIVATE LIMITED
- Contracting Partner: Gillanders Arbuthnot & Co. Ltd. (MICCO Division)
- Project Name: Tar D Tank Project
- Project Location: AM/NS Hazira, Surat, Gujarat
- Plant Area: Coke Oven By-Product (COBP)
- Work Order Date: 3 September 2026
- Principal Scope: Tank erection, structural dismantling, and welding and grinding of tank joints for NDT requirements.
Detailed Scope of Work
The work order defines three principal activities. These activities require proper site coordination, skilled manpower, suitable tools and equipment, material handling, and compliance with the applicable technical and safety requirements.
1. Erection of the Tar D Tank
Tank erection is a major component of the assigned project scope. The work involves carrying out the required erection activities in accordance with approved drawings, AM/NS technical specifications, and the applicable site procedures.
Before starting the erection activities, the relevant drawings, work requirements, site conditions, and execution arrangements must be reviewed. The work sequence is coordinated with the concerned site representatives to ensure that the activities are undertaken according to the approved project requirements.
The work order requires the contractor to arrange the necessary labour, skilled manpower, supervisory staff, consumables, and applicable tools and tackles within the agreed scope. Equipment and infrastructure are to be arranged in accordance with the approved erection and dismantling scheme and contractual responsibilities.
During execution, attention is given to safe working practices, coordination among deployed personnel, and compliance with the applicable site requirements. The work is performed according to the approved technical specifications and drawings.
The work order indicates a quantity of 25 MT for tank erection, with the actual quantity governed by the approved drawings and applicable contractual provisions.
2. Dismantling of Structural Materials
The second major activity is the dismantling of designated structural materials associated with the project.
Structural dismantling requires proper planning, identification of the materials to be dismantled, and coordination with the concerned site team. The activities must follow the applicable dismantling scheme and site safety requirements.
The scope includes dismantling structural materials, cleaning the work area after dismantling, and arranging the segregation, handling, and transportation of dismantled materials to the designated locations.
The contractor is responsible for the collection, loading, transportation, and unloading of the relevant materials within the scope specified in the work order. Materials designated for transfer to the MRD, scrap yard, or another location within the AM/NS works are to be handled in accordance with the applicable site instructions.
Where dismantled parts are required to be handed over to the department as spare materials, the work order specifies that they must be weighed and accompanied by the mandatory weighment slip.
The work also includes the required enabling activities for the removal of weight blocks from the designated area, where applicable to the approved work arrangement.
Proper material segregation, transportation, and housekeeping help maintain an organized work area and support the orderly execution of the dismantling activities.
The work order indicates a quantity of 15 MT for structural dismantling.
3. Welding and Grinding of Tank Joints for NDT
Welding and grinding of tank joints form the third principal component of the assigned work.
These activities are undertaken in accordance with the applicable technical specifications, approved drawings, and project requirements. Welding and grinding work requires suitable equipment, skilled personnel, and coordination with the site team to ensure that the specified joint preparation and finishing requirements are addressed.
The work order specifically identifies welding and grinding of Tar Tank joints for non-destructive testing (NDT). Accordingly, the work must be performed with due attention to the requirements applicable to the joints designated for inspection.
The necessary consumables, including welding electrodes, gas, and other items falling within the contractor’s scope, are to be arranged by the contractor. The work order also specifies the provision of labour, skilled manpower, and supervisory staff as required for execution.
Site personnel must follow the prescribed safety procedures, use the required personal protective equipment (PPE), and comply with the applicable permit and work-clearance requirements.
Coordination with the concerned site representatives is important for carrying out the specified activities and supporting inspection and acceptance requirements.
The work order indicates a quantity of 1,200 running metres (RM) for welding and grinding of tank joints for NDT requirements.
Material Handling and Transportation
Material handling is an important supporting activity within the project scope, particularly during structural dismantling and the movement of dismantled materials.
As specified in the work order, the contractor’s responsibilities include the collection, loading, transportation, and unloading of relevant materials at the designated locations. Segregation and stacking must be undertaken as required by the applicable site instructions.
Where materials are required to be transported to the MRD, scrap yard, or another location within the AM/NS works, the transportation arrangements must follow the contractual scope and approved site requirements.
The contractor must also ensure that materials designated for departmental handover are properly weighed and supported by the required weighment documentation.
These activities support organized site operations, efficient material movement, and compliance with the applicable material-accountability requirements.
Manpower, Tools and Equipment
Successful execution of industrial work depends on appropriate manpower planning and the availability of suitable tools and equipment.
Under the work order, Karmasthala Infra & Services is responsible for deploying the required labour, skilled manpower, supervisory staff, and safety personnel in accordance with site requirements and the agreed scope.
The deployment arrangement is determined by the project requirements and instructions from the concerned site representatives. The contractor must ensure that adequate manpower is available to carry out the assigned activities.
The work order also requires the contractor to arrange the necessary tools, tackles, consumables, and other applicable infrastructure required for the erection and dismantling work, in accordance with the approved scheme and contractual responsibilities.
The contracting partner has specified that certain equipment, including a hydra, crane, trailer, and electric winch, will be provided during execution as required. Construction machinery and other equipment specifically allocated to the contractor’s scope must be arranged accordingly.
Proper coordination of manpower, tools, tackles, and equipment helps support the planned sequence of work and compliance with site requirements.
Quality Control and NDT Requirements
Quality is an essential consideration in tank erection, welding, grinding, and structural dismantling activities.
The work order requires the contractor to execute the work in accordance with the applicable technical specifications, approved drawings, and relevant site requirements. The completed work is subject to the applicable inspection and acceptance procedures of the client and site authorities.
For welding and grinding activities associated with NDT, the relevant work must meet the specified requirements for inspection. The contractor must coordinate with the concerned site representatives and complete the required activities in accordance with the approved procedures.
The contractual conditions also require necessary inspection certificates to be obtained after inspection and acceptance by the designated authorities, where applicable.
Karmasthala Infra & Services recognizes the importance of workmanship, technical compliance, proper coordination, and timely rectification of any deficiencies identified during inspection.
Safety and Compliance at AM/NS Hazira
Industrial work at a steel plant requires strict attention to occupational safety and environmental requirements.
The work order specifies compliance with the applicable AM/NS and SMS safety rules, statutory obligations, labour regulations, and site procedures. The contractor is responsible for ensuring that deployed personnel follow the required safety practices.
Key contractual safety responsibilities include:
- Providing and ensuring the use of appropriate personal protective equipment (PPE).
- Arranging the required worker and supervisor gate passes.
- Following applicable safety regulations, permit requirements, and work-clearance procedures.
- Providing the necessary safety supervision and ensuring that workers follow site instructions.
- Maintaining proper housekeeping of the work area, yard, and site.
- Complying with applicable statutory requirements, including PF, ESI, labour regulations, and workers’ compensation obligations.
- Arranging the required insurance coverage for deployed workers and supervisory staff in accordance with the work order.
Safety compliance is an integral part of project execution and must be maintained throughout the assigned activities.
Project Planning and Execution
The work order specifies a completion period of four weeks for the job. Execution planning therefore requires coordination of the assigned work activities, manpower, equipment, material movement, and applicable inspection requirements.
The contractual conditions require daily reporting of manpower strength and progress achieved. The contractor’s site representative is responsible for submitting the required information to the concerned supervisor or in-charge.
Progress documentation and supporting measurements are important for monitoring execution and preparing running account (RA) bills. The work order specifies monthly billing along with the required measurement details, statutory documents, and material reconciliation statements.
The contractor must also comply with the prescribed documentation and vendor-approval requirements and provide the relevant supporting records when required.
Proper planning, regular reporting, and coordination with the contracting partner help maintain visibility of progress and support the orderly execution of the project.
Our Commitment to Industrial Contracting
At KARMASTHALA INFRA & SERVICES PRIVATE LIMITED, we aim to provide dependable industrial contracting services through disciplined execution, appropriate manpower deployment, compliance with technical requirements, and a strong focus on workplace safety.
Our involvement in the Tar D Tank Project at AM/NS Hazira reflects our continued focus on industrial tank erection, structural dismantling, welding, grinding, and associated material-handling activities.
We understand the importance of coordinating with clients, contracting partners, site representatives, and inspection teams in industrial environments. Our approach emphasizes adherence to approved drawings, contractual requirements, applicable safety standards, and project documentation procedures.
We remain focused on building professional relationships and supporting industrial projects through reliable execution and quality-conscious work practices.
Conclusion
The Tar D Tank Project at AM/NS Hazira, Surat, represents an important engagement for KARMASTHALA INFRA & SERVICES PRIVATE LIMITED in the industrial contracting sector.
Awarded by Gillanders Arbuthnot & Co. Ltd. (MICCO Division), the work covers tank erection, structural dismantling, and welding and grinding of tank joints for NDT requirements, together with the associated material-handling and site-support activities defined in the work order.
Through proper planning, skilled manpower deployment, technical coordination, safety compliance, and attention to workmanship, Karmasthala Infra & Services aims to execute its assigned responsibilities in accordance with the approved project requirements.
KARMASTHALA INFRA & SERVICES PRIVATE LIMITED
Industrial Contracting | Tank Erection | Structural Works | Welding & Grinding | Manpower Solutions
Contact Us
Email: hr@karmasthala.com
Website: www.karmasthala.com
Phone: +91 8766357441 | +91 9099510066